

- Cleaning bamboo floors with methylated spirits install#
- Cleaning bamboo floors with methylated spirits free#
Cleaning bamboo floors with methylated spirits free#
They should be free from any contaminants. Apply weights to flooring until dry – a minimum of 24 hours.Ĭeramic/resilient tile must be well bonded to sub-floor, in good condition, clean and level. Apply with a Sika glue gun to each slot in the underlay. Bond with Sika T53, 1 x 600ml sausages per m2. On building upper levels, or if you chose to use an acoustic underlay for extra sound proofing, Plantation recommend acoustic underlay ‘Sika Acoubond’.
Cleaning bamboo floors with methylated spirits install#
To install on a wood-covered sub-base, bond with Sika T55 and apply with V-notched adhesive trowel. Wood sub-floors may require sanding to improve glue adhesion. Wood sub-floors must be dry, well-secured, and checked for moisture content. Existing wood floor or Plywood (10 mm minimum).The quality of your floor installation is dependent on the quality and preparation of the sub-floor. 12 metres, or when the floor is installed in more than one room a dilatation (expansion) gap should be placed. This distance should be a minimum of 8mm.

It is of the utmost importance that you maintain distance (expansion gap) from walls, door frames, pipes, etc. Excessive air humidity causes bamboo materials to swell whilst low air humidity results in shrinking. ▪ Don’t store loose bamboo boards directly on concrete or near outside walls, long-term.īamboo and wood are natural products which are affected by air humidity. bathroom, laundry and external doors andwindows. ▪ During installation special precautions to seal sides and ends of cut boards should be taken where water may enter, e.g. Please refer to the Plantation Warranty conditions when installing in a wet area. ▪ Unless the sub-floor and bamboo are properly sealed, bamboo flooring may not be suitable for bathrooms or laundries (due to the higher room humidity). Room temperature of 15-20 degrees Celsius and humidity of 40- 60% is recommended. Room temperature and humidity of installation area should be consistent with normal, year-round living conditions for at least a week before flooring installation. ▪ All work involving water or moisture should be completed well before installing bamboo flooring. ▪ Bamboo flooring should be one of the last items installed in any new construction or renovation project. Prior to installation of any floor, the installer must ensure that the job site and sub-floor meet the following requirements:
